K Type
1. Recycle use: All components are standard and fabricated in factory, which makes it suitable in recycle use for many times.
2. Various selection: The house can be designed as single, two or three stories. The outer panels can be selectable based on fireproof or non-fireproof materials.
3. Quick installation: It is quick to erect due to the light-weight materials. Estimate six skilled workers can finish 200m2 in two days.
4. Environmental protection: The materials can be recycled and no construction waste during construction.
5. Flexible design: The panel can be placed anywhere to form the layout.
Product Photos
External Appearance

Internal Appearance

Product Specification
Company Photos


Project Reference

1. Recycle use: All components are standard and fabricated in factory, which makes it suitable in recycle use for many times.
2. Various selection: The house can be designed as single, two or three stories. The outer panels can be selectable based on fireproof or non-fireproof materials.
3. Quick installation: It is quick to erect due to the light-weight materials. Estimate six skilled workers can finish 200m2 in two days.
4. Environmental protection: The materials can be recycled and no construction waste during construction.
5. Flexible design: The panel can be placed anywhere to form the layout.
Product Photos
External Appearance

Internal Appearance

Product Specification
Product specification | Length | nM+160(n=4,5,6…) M means modulu (1M=1820mm) | |
width | nM+160(n=4,5,6…) M means modulu (1M=1820mm) | ||
height | One floor: the wall height/ridge height is 2870mm/3545mm | ||
Second floor: the wall height/ridge height is 5720mm/6395mm | |||
Three floor: the wall height/ridge height is t8570mm/9245mm | |||
Roof type | Double slope, width≤9000mm,slope of roof is 1:5, Single slope, width>9000mm,slope of roof is 1:8 | ||
storey | 1-3 storey | ||
Design Parameters (standard) | Roof dead load | 0.3KN/m2 | |
Floor dead load | standard: 0.5KN/m2 * Special requirements can be individually customized | ||
Floor live load | 2.0KN/m2 | ||
Roof live load (snow load) | 0.5KN/m2 | ||
wind load | 0.45KN/m2 | ||
anti-seismic | 7 degrees | ||
Recommended function | mainly used for office, dormitory, dining hall, recreation room, etc. | ||
structure | Column | double C shape steel back to back, and the section depends on the building span. Metal code Q235 | |
Roof beam | truss beam. The section depends on the building span. Metal code Q235 | ||
Floor beams | truss beam. The section depends on the building span. Metal code Q235 | ||
paint | Paint treatment | ||
roof | materials | color steel sandwich panel | |
Insulation | Polystyrene, fire rated B2 | ||
Glass wool, fire rated A grade | |||
/ | |||
Wall surface | materials | color steel sandwich panel | |
Insulation | Polystyrene, fire rated B2 | ||
Glass wool, fire rated A grade | |||
/ | |||
door | size | According to the need to determine the door size | |
Material | steel frame sandwich door | ||
window | Type | Sliding window | |
Frame material | Standard: Steel | ||
glass | Standard: single glass | ||
ceiling | normal room | Standard: waterproof gypsum board Optional: calcium silicate board, mineral wool sound-absorbing board, aluminum buckle board (according to function and climate) | |
Water room | PVC, aluminium alloy board, water-proof plaster board | ||
Ground form | suspended floor (standard 400mm high) | Water room shower, common room wood floor, PVC floor leather | |
floor | (single storey)anti-skidding floor tile for the room with water spattering, ceramic tile for other rooms | ||
floor | Ordinary room | Wooden floor, PVC floor sheet | |
Water room | shower cabin (recommended) | ||
Electricity | we can offer the scheme/designing/construction technique services | ||
socket | multifunctional socket(250V/10A) three flat pins socket (250V/16A) we can be equipped with European, American, and Australian standards according to demand | ||
Cable | BV-1.5mm² / BV-2.5mm² / BV-4mm² | ||
Voltage | 220/380V | ||
breaker | High segmentation miniature circuit breaker | ||
water | we can offer the scheme/designing/construction technique services | ||
water supply | PPR | ||
drainage system | UPVC |
Company Photos


Project Reference
